Khaled A.S. Abdel-Ghaffar
IEEE Trans. Inf. Theory
We consider the open shop, job shop, and flow shop scheduling problems with integral processing times. We give polynomial-time algorithms to determine if an instance has a schedule of length at most 3, and show that deciding if there is a schedule of length at most 4 is NP-complete. The latter result implies that, unless P = NP, there does not exist a polynomial-time approximation algorithm for any of these problems that constructs a schedule with length guaranteed to be strictly less than 5/4 times the optimal length. This work constitutes the first nontrivial theoretical evidence that shop scheduling problems are hard to solve even approximately.
Khaled A.S. Abdel-Ghaffar
IEEE Trans. Inf. Theory
David A. Selby
IBM J. Res. Dev
Robert C. Durbeck
IEEE TACON
Xinyi Su, Guangyu He, et al.
Dianli Xitong Zidonghua/Automation of Electric Power Systems